Central Illapa, Mejillones, Chile

Fuel:

Status: ,

Capacity (MW): 256 MW nominal with the potential to increase to 358 MW

Central Illapa was a 256 MW open cycle Greenfield gas fired power development which IPC originally developed and later sold to Rurelec.

The project had the potential to convert to a 358 MW combined cycle power plant as part of its second stage development.